Article 3. Electricity
15-301 Electric rates.
The City of Mount Hope adopts the electric rates as herein provided, in order to provide adequate and continuous electrical service distributed fairly and equally to all customers of the City. The electric rates charged by the City shall be as follows:
(Ord. 212-2015; Ord. 259-2021; Ord. 262-2021)
15-302 Demand meter charges.
Those customers of the city with three phase service shall have demand meters. The charges will be as follows:
(Ord. 136-2006; Ord. 212-2015)
15-303 Temporary service.
The governing body of the city has deemed it necessary to establish a charge of $25 to electrical customers of the city to pay for installing and removing equipment necessary to furnish temporary electric service.
(Ord. 80-3-18A, Sec. 1)
15-304 Distributed generation.
Distributed Generation will be offered on a first come first served basis to both Residential and Commercial/Industrial customers. In no case shall the City be obligated to purchase an amount greater than 4% of the utility’s peak power requirement for the previous year.
Distributed Generation Customer Rates
Appropriately sized generators (as defined in K.S.A. 66-1,184) owned by customer generators will at times either generate more electricity than the customer can consume on premises or only meet a portion or none of the customers electricity needs. During periods of time when the generator owned by the customer generator cannot provide all of the customer’s electricity needs, the electricity provided by the electric utility will be billed at the same rate as that established for similar rate class customers that do not own generators. During periods of time when the generator owned by the customer generator produces electricity in excess of its own needs, and such excess electricity is supplied back to the electric utility, the electric utility shall compensate the customer for this excess energy at a rate that is 150% of the utility’s monthly system average cost of energy per kilowatt hour, per K.S.A. 66-1,184.
The electric utility may, at its discretion, either pay the customer for excess energy at aforementioned rate or calculate such payment and deduct from the customer’s bill as a credit.
(Ord. 259-2021; Ord. 262-2021)
15-305 Power cost adjustment.
A Power Cost Adjustment may be passed on to electric customers in the event the Governing Body determines extraordinary expenses must be recovered to maintain reliable electric utility service to the customers of Mount Hope, Kansas. Such adjustments will be brought before the Governing Body and subject to a majority vote.
(Ord. 259-2021; Ord. 262-2021)
15-306 Annual rate review.
The Governing Body will review the current electric rate structure and annual operating budget of the electric utility each December to det ermine if rates are set appropriately in correlation to annual budget requirements.
(Ord. 259-2021; Ord. 262-2021)
15-307 Interconnection standards for installation and parallel operation of customer-owned renewable electric generation facilities.
(Ord. 261-2021)